Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Allied Telesis Manuals
Switch
950 Series
Installation manual
Figure 47: Attaching The Equipment Rack Brackets; Figure 48: Installing The Switch In An Equipment Rack - Allied Telesis 950 Series Installation Manual
Advanced layer 3+ stand-alone switches
Hide thumbs
1
2
3
4
Table Of Contents
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
page
of
166
Go
/
166
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Advertisement
Chapter 5: Installing the Switch in an Equipment Rack
Figure 47. Attaching the Equipment Rack Brackets
4. Have another person hold the switch in the equipment rack while you
secure it using standard equipment rack screws (not provided). Refer
to Figure 48.
Figure 48. Installing the Switch in an Equipment Rack
90
Table of
Contents
Previous
Page
Next
Page
1
...
87
88
89
90
91
92
93
94
Advertisement
Table of Contents
Related Manuals for Allied Telesis 950 Series
Switch Allied Telesis AT-x950-28XSQ Installation Manual
Virtual chassis stacking. advanced layer 3+ switch (190 pages)
Switch Allied Telesis AT 9924SP AT-9924SP-30 AT-9924SP-30 Software Manual
Configure epsr (ethernet protection switching ring) to protect a ring from loops (56 pages)
Switch Allied Telesis 9400 SERIES Datasheet
Managed gigabit ethernet switches with enhanced security and layer 2-4 intelligence (3 pages)
Switch Allied Telesis AT-9748TS/XP Brochure
Layer 3 advanced ipv4 and ipv6 gigabit switches / stackable gigabit ethernet switches / fast ethernet switches (6 pages)
Switch Allied Telesis AT-9900s Installation And Safety Manual
Allied telesis switch installation and safety guide (38 pages)
Switch Allied Telesis SB244-03 Specification
Allied telesis series switches data specification (8 pages)
Switch Allied Telesis Layer 3 Switches Network Manual
Managed layer 3 switches (31 pages)
Switch Allied Telesis AT-GS950/10PS User Manual
Gigabit ethernet poe switches (86 pages)
Switch Allied Telesis AT-FS750/20 User Manual
Fs750 series fast ethernet websmart switches (444 pages)
Switch Allied Telesis AT-x510-28GTX Command Reference Manual
Stackable gigabit edge switches (2601 pages)
Switch Allied Telesis AlliedWare Plus AT-x230-10GP Command Reference Manual
X230 series enterprise poe+ gigabit edge switches (1536 pages)
Switch Allied Telesis AT-8012M Installation Manual
At-8000 series layer 2 fast ethernet switches (116 pages)
Switch Allied Telesis AT-8016F/MT Installation Manual
Fast ethernet switches at-8000 series (103 pages)
Switch Allied Telesis AlliedWare Plus GS980MX Series Installation Manual
Stackable gigabit layer 3+ ethernet switches (254 pages)
Switch Allied Telesis AT-9000/28 Installation Manual
At-9000 managed layer 2 ge ecoswitch series (70 pages)
Switch Allied Telesis AT-9000/28 Command Line User's Manual
Alliedware plus version 2.1.2 management software for layer 2-4 gigabit ethernet ecoswitches (1276 pages)
Related Content for Allied Telesis 950 Series
x330-52GTX Figure 44: Attaching The Equipment Rack Brackets To The X330-28Gtx Switch
Allied Telesis x330-52GTX
CentreCOM GS970EMX/52 Figure 44: Attaching The Equipment Rack Brackets To The Gs970Emx/28 Switch
Allied Telesis CentreCOM GS970EMX/52
8100L Series Figure 24: Attaching The Brackets To Install The Switch In An Equipment Rack
Allied Telesis 8100L Series
FS970M Series Figure 23: Attaching The Equipment Rack Brackets
Allied Telesis FS970M Series
x330 Series Figure 39: Attaching The Equipment Rack Brackets To The X330-28Gtx Switch
Allied Telesis x330 Series
x330 Series Figure 42: Attaching The Equipment Rack Brackets To The X330-28Gtx Switch
Allied Telesis x330 Series
CentreCOM GS970EMX Series Figure 39: Attaching The Equipment Rack Brackets To The Gs970Emx/28 Switch
Allied Telesis CentreCOM GS970EMX Series
AlliedWare Plus Figure 53: Attaching The Equipment Rack Brackets
Allied Telesis AlliedWare Plus
GS950 PS V2 Series Figure 22: Attaching The Equipment Rack Brackets
Allied Telesis GS950 PS V2 Series
AT-IE510-28GSX Figure 15: Attaching The Equipment Rack Brackets For A 19-Inch Rack, Mid Mount (Pre-Installed Bracket Position)
Allied Telesis AT-IE510-28GSX
x950 Series Figure 85: Attaching The Equipment Rack Brackets
Allied Telesis x950 Series
x950 Series Figure 48: Attaching The Equipment Rack Brackets
Allied Telesis x950 Series
AlliedWare Plus x950 Series Figure 64: Attaching The Equipment Rack Brackets
Allied Telesis AlliedWare Plus x950 Series
AT-x950-28XSQ Figure 63: Attaching The Equipment Rack Brackets
Allied Telesis AT-x950-28XSQ
AT-x930-28GTX Figure 40: Attaching The Equipment Rack Brackets
Allied Telesis AT-x930-28GTX
AT-x510-28GTX Figure 25: Attaching The Equipment Rack Brackets
Allied Telesis AT-x510-28GTX
This manual is also suitable for:
At-x950-28xsq
At-x950-28xtqm
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL