6. Insert the four anchors into the holes.
7. Have two people hold the switch at the selected wall location while you
secure it to the wall with the four provided screws. Refer to Figure 57.
Figure 57. Installing the Switch on a Concrete Wall
8. Do one of the following:
To install the power supplies, go to "Installing AT-PWR600 AC
Power Supplies" on page 72.
To install an optional XEM2 Ethernet Line Card, go to "Installing an
Optional XEM2 Ethernet Line Card" on page 76.
If all the components are installed, go to Chapter 7, "Verifying and
Configuring the Switch" on page 109.