Allied Telesis 950 Series Installation Manual page 8

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

Figures
Figure 50: Minimum Wall Area Dimensions with the Front Panel on the Left.......................................................................95
Figure 51: Minimum Wall Area Dimensions with the Front Panel on the Right ....................................................................96
Figure 52: Switch on the Wall with a Plywood Base .............................................................................................................97
Figure 53: Steps to Installing the Switch with a Plywood Base.............................................................................................98
Figure 54: Installing the Brackets to the Switch for Wall Installation...................................................................................102
Figure 55: Attaching the Switch to the Plywood Base ........................................................................................................104
Figure 56: Marking the Locations of the Bracket Holes on a Concrete Wall.......................................................................106
Figure 57: Installing the Switch on a Concrete Wall ...........................................................................................................107
Figure 58: Connecting the AC Power Cord.........................................................................................................................111
Figure 59: Securing the Power Cord with the Restraining Strap ........................................................................................111
Figure 60: Connecting the Power Cord to an AC Power Source ........................................................................................112
Figure 61: Connecting the Management Cable to the Console RS-232 Port .....................................................................113
Figure 62: User Exec Mode Prompt....................................................................................................................................114
Figure 63: SHOW STACK Command .................................................................................................................................116
Figure 64: Moving to the Global Configuration Mode .........................................................................................................117
Figure 65: Confirmation Prompt for the NO STACK ENABLE Command ..........................................................................117
Figure 66: Returning to the Privileged Exec Mode .............................................................................................................117
Figure 67: Saving the Changes with the WRITE Command...............................................................................................118
Figure 68: Returning to the Privileged Exec Mode .............................................................................................................121
Figure 69: Saving the Changes with the WRITE Command...............................................................................................121
Figure 70: Handle on 100Gbps Transceivers for AT-XEM2-1CQ Line Cards ....................................................................125
Figure 71: SP10T Transceivers ..........................................................................................................................................127
Figure 72: Installing an SFP or SFP+ Transceiver .............................................................................................................129
Figure 73: Installing 40Gbps Fiber Optic Transceivers in AT-XEM2-4QS Line Cards........................................................130
Figure 74: Installing 100Gbps QSFP28 Transceivers in Base Ports 25 to 37 ....................................................................130
Figure 75: Installing 100Gbps QSFP28 Transceivers in AT-XEM2-1CQ Line Cards .........................................................131
Figure 76: Installing SP10TW Direct Attach Cables ...........................................................................................................132
Figure 77: Attaching QSFPCU Cables................................................................................................................................133
Figure 78: Loosening the Screws on the Ethernet Line Card .............................................................................................137
Figure 79: Disconnecting an Ethernet Line Card from the Switch ......................................................................................138
Figure 80: Sliding an Ethernet Line Card from the Switch ..................................................................................................138
Figure 81: Placing the Ethernet Line Card in its Anti-static Bag .........................................................................................139
Figure 82: Installing the Line Card Blank Cover .................................................................................................................139
Figure 83: Tightening the Two Screws on the Line Card Blank Panel................................................................................140
Figure 84: Disconnecting the AC Power Cord from the Power Source ..............................................................................141
Figure 85: Opening the Restraining Strap on the Power Supply ........................................................................................142
Figure 86: Disconnecting the Power Cord from the Power Supply.....................................................................................142
Figure 87: Removing the Power Supply .............................................................................................................................143
Figure 88: Removing a Power Supply ................................................................................................................................144
Figure 89: Installing the Blank Power Supply Cover...........................................................................................................145
Figure 90: Loosening the Screws on the Fan Module ........................................................................................................146
Figure 91: Disconnecting the FAN05 Module from the Switch ...........................................................................................147
Figure 92: Sliding the Fan Module from the Switch ............................................................................................................147
Figure 93: Removing the Fan Module from the Shipping Container...................................................................................148
Figure 94: Aligning the FAN05 Module in the Switch Slot ..................................................................................................149
Figure 95: Seating the FAN05 Module on the Internal Connector ......................................................................................149
Figure 96: Tightening the Two Captive Screws on the FAN05 Module ..............................................................................150
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents