Figure 72: Installing An Sfp Or Sfp+ Transceiver - Allied Telesis 950 Series Installation Manual

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

To install a fiber optic transceiver, perform the following procedure:
1. Select a port for the transceiver.
2. If the selected port has a dust cover, remove it.
3. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
4. Orient the transceiver and slide it into the port until it clicks into place.
The correct orientation depends on the line card and transceiver:
Base ports 1 to 24 and AT-XEM2-12XS Line Card - To install a
transceiver in an odd numbered port, position it with its handle on
top. To install a transceiver in an even numbered port, position it
with its handle on the bottom. Refer to Figure 72.
Handle
Figure 72. Installing an SFP or SFP+ Transceiver
40Gbps transceivers in AT-XEM2-4QS Line Cards - refer to Figure
73 on page 130.
x950 Series Installation Guide for Stand-alone Switches
129

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents