Figure 77: Attaching Qsfpcu Cables - Allied Telesis 950 Series Installation Manual

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

Release Tab
5. Connect the other end of the cable into a compatible port on another
network device.
6. Repeat this procedure to install additional direct attach cables.
Note
To remove a cable from the port, gently push on the connector, pull
on the release tab, and slide the connector from the port.
x950 Series Installation Guide for Stand-alone Switches
Figure 77. Attaching QSFPCU Cables
133

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents