Chapter 2: Beginning The Installation - Allied Telesis 950 Series Installation Manual

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

Chapter 2
Beginning the Installation
The chapter contains the following sections:
"Reviewing Safety Precautions" on page 54
"Installation Options" on page 59
"Choosing a Site for the Chassis" on page 60
"Unpacking the Switch" on page 61
"Verifying the Accessory Kit" on page 65
"Unpacking the AT-PWR600 AC Power Supply" on page 67
53

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents