Chapter 7: Verifying And Configuring The Switch - Allied Telesis 950 Series Installation Manual

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

Chapter 7
Verifying and Configuring the Switch
This chapter contains the following procedures:
"Disabling VCStack" on page 116
"Configuring Ports 25 to 37" on page 119
109

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents