Chapter 2: Beginning the Installation
58
If any item is missing or damaged, contact your Allied Telesis sales
representative for assistance.
6. After unpacking the switch, do one of the following:
To unpack the power supplies, go to "Unpacking SBxPWRSYS2
AC Power Supplies" on page 59 or "Unpacking SBxPWRSYS1-80
DC Power Supplies" on page 60.
Otherwise, go to Chapter 3, "Installing the Chassis" on page 61.
One 2 m (6.6 ft) local management
cable with RJ-45 (8P8C) and DB-9 (D-
sub 9-pin) connectors.
Two power cord retaining clips
Figure 21. Accessory Kit