Adjusting The Equipment Rack Brackets; Figure 24: Chassis Orientations In The Equipment Rack - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Stand-alone switches
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

SBx908 GEN2 Installation Guide for Stand-alone Switches

Adjusting the Equipment Rack Brackets

The chassis comes with two pre-installed equipment rack brackets. The
default positions of the brackets align the front of the chassis with the front
of the equipment rack. You can re-position the brackets on the sides of the
chassis to have the device extend in front of the rack. Figure 24 here and
Figure 25 on page 64 and Figure 26 on page 65 show the various bracket
and chassis orientations. The first illustration in Figure 24 shows the
default positions of the brackets.
Figure 24. Chassis Orientations in the Equipment Rack
63

Advertisement

Table of Contents
loading

Table of Contents