Monitoring The Initialization Processes; Figure 85: Switch Initialization Messages - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Stand-alone switches
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Monitoring the Initialization Processes

Loading flash:sbx908ng-braodcomdev-20170406-1.rel
Verifying release... OK
Booting...
<- setup_system()
Starting base/first...
Mounting virtual filesystems...
______________
/\ \
/
\ \_
/
\ |
/
\ \
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v0.0.0
Current release filename: sbx908ng-broadcomdev-20170406-1.rel
Built: Wed Apr 5 20:36:24 UTC 2017
Mounting static filesystems...
Attaching to /dev/mtd1...
Mounting file system...
Checking for last gasp debug output...
Initializing random number generator...
Starting base/hwrandom...
Starting base/dbus...
Starting base/syslog...
Starting base/loopback...
Starting base/sysctl...
Starting base/portmapper...
Received event syslog.done
It takes about three minutes for the switch to initialize its management
software programs and features, and load the default configuration. You
can monitor the bootup sequence by connecting a terminal or computer
that has a terminal emulator program to the Console port on the switch.
(The settings of the Console port are provided in "Starting a Local
Management Session" on page 127.) The switch displays the messages in
Figure 85 here to Figure 87 on page 123 on the Console port as it
initializes the management software.
____
/ /______\
__/ /| ______ |
|
/
| ______ |
/ /
\ ____ /
Figure 85. Switch Initialization Messages
SBx908 GEN2 Installation Guide for Stand-alone Switches
[
OK
[
OK
[
OK
[
OK
[
OK
[
OK
[
OK
[
OK
[
OK
[
OK
[
OK
[
OK
[
OK
]
]
]
]
]
]
]
]
]
]
]
]
]
121

Advertisement

Table of Contents
loading

Table of Contents