Installing The Blank Power Supply Slot Cover; Figure 49: Lifting The Locking Handle On The Blank Power Supply Slot Cover - Allied Telesis SwitchBlade x908 GEN2 Installation Manual

Stand-alone switches
Hide thumbs Also See for SwitchBlade x908 GEN2:
Table of Contents

Advertisement

Installing the Blank Power Supply Slot Cover

If you installed only one power supply in the chassis, check that the empty
power supply slot is covered with the blank power supply slot cover
included with the chassis. Do one of the following:
If the chassis has two power supplies or if the empty power supply
is already covered, go to "Installing the Power Cord Retaining
Clips" on page 87.
If a power supply slot is uncovered, continue with the procedure in
this section.
To install the bank power supply slot cover, perform the following
procedure:
1. Lift the locking handle on the bank power supply slot cover. Refer to
Figure 49.
Figure 49. Lifting the Locking Handle on the Blank Power Supply Slot
2. Align the cover in the empty power supply slot and carefully slide it into
the slot. Figure 50 on page 86 shows the cover being installed in the
PSU B slot.
SBx908 GEN2 Installation Guide for Stand-alone Switches
Cover
85

Advertisement

Table of Contents
loading

Table of Contents