17. Install the S Plate Assembly
(1) Align the two pins of the S plate assembly
with the two holes of the chassis. Then
tighten the screw while moving the S plate
assembly clockwise.
c
Never touch the tape cleaner with bare hands.
The tape cleaner has a sharp edge.
(2) Connect the connector into connectors
CN210 on the EQ-66 board and CN851 on
the PD-35 board.
(3) Bind the harness with the harness clamper (or
the equivalent).
(4) Connect the connector into the full erase head
board.
(5) Bind the harness with the harness clamper (or
the equivalent).
18. Install the Pinch Press Assembly
Refer to steps 3 and 4 in Section 3-6-3.
19. Put the Unit into the Unthreading End
Mode
20. Install the S Tension Regulator
Assembly
Refer to step 3 in Section 3-4-1.
21. Install the T Drawer Assembly
Refer to step 3 in Section 3-6-6.
22. Confirm the T Drawer Assembly
Operation
Refer to step 4 in Section 3-6-6.
23. Install the CL Guide Rail
Install the CL guide rail with two screws.
24. Confirm the CL Arm Assembly
Operation
Refer to step 3 in Section 3-5-1.
GY-2120WD/WS
Connector (CN210)
Screw (PWH3 x 8)
Tape cleaner
S plate
assembly
Pins
Install the S Plate Assembly
Screw (B3 x 8)
Install the Pinch Arm Guard
3-5. Threading Ring Block
EQ-66 board
Harness clamper
Connecter
Connector (CN851)
PD-35 board
Full erase
head board
Screw (B3 x 8)
CL guide rail
3-59