Ac Power - Thermo Scientific SOLA II Flare User Manual

Sulfur online analyzer
Table of Contents

Advertisement

AC Power

Thermo Scientific
AC power to the X-Purge is connected by the customer. Power wiring and
circuit breakers must be sized appropriately. Refer to drawings provided with
the system for connection information and power requirements.
Customers must provide a suitable power switch near the system for use by
maintenance personnel.
Warning Electrical power must be free of spikes, sags, surges or electrical
noise.▲
AC power to any system using the X-Purge is connected directly to the X-Purge
unit rather than the analyzer. The X-Purge unit controls the power to the
instrument to ensure safe operation in hazardous areas. Consult the following
table for ac power connections to the X-Purge unit.
Table F–4.
Power
Hot
Neutral
Ground
Power out (switched)
Terminals 1 and 2 are jumpered together.
1
2
Terminals 3 and 4 are jumpered together.
Terminal
TB1-1
1
TB1-3
2
TB1-5
TB1-6
SOLA II Flare User Manual
Appendix F
The X-Purge System
F-4

Advertisement

Table of Contents
loading

Table of Contents