Installation, Setup, and
Operation
PREPARING TO INSTALL THE HFV
GENERATOR
The following sections provide information that you need to understand before
installing the HFV generator.
Spacing Requirements
See
Figure 3-1 on page 3-4
Installation Requirements
Install this unit according to the following requirements.
Operating and maintenance personnel must receive proper training
before installing, troubleshooting, or maintaining high-energy electrical
equipment. Potentially lethal voltages could cause death, serious
personal injury, or damage to the equipment. Ensure that all appropriate
safety precautions are taken.
RISK OF DEATH OR BODILY INJURY. Disconnect and lockout/tagout all
sources of input power before working on this unit or anything
connected to it.
5705211-C
for unit dimensions.
Installation, Setup, and Operation
HFV 8000 Generator
Chapter
Chapter
5
5-1