T3: Host Acknowledges Unit Response; Ae Bus Communications Transaction Example; Ae Bus Commands; Figure 4-11. Communications Transaction Example - Advanced Energy HFV 8000 User Manual

Table of Contents

Advertisement

T
: HOST ACKNOWLEDGES UNIT RESPONSE
3
If the HFV generator receives an ACK (15h) from the host computer, it returns to the
normal waiting state. If the HFV generator receives a NAK (06h) from the host
computer, the HFV generator retransmits the response packet. The HFV generator
continues to retransmit in response to NAK transmissions until the host computer
stops the cycle. If the HFV generator receives no response, it assumes an ACK and
returns to the waiting state.

AE BUS COMMUNICATIONS TRANSACTION EXAMPLE

Figure 4-11 is a simplified graphic showing the steps in an example communications
transaction between a host computer and an HFV generator.

Figure 4-11. Communications transaction example

AE Bus Commands

The following sections describe the command status response (CSR) codes returned
by the HFV generator in response to a command as well as the AE Bus commands for
the HFV generator.
5705211-C
Host
Communication Interfaces
HFV 8000 Generator
HFV
4-17

Advertisement

Table of Contents
loading

Table of Contents