Before Engaging the Rear Circuit Breaker
Become familiar with the Unpacking, Spacing Requirements, and Grounding sections
in this chapter. Also, review the following sections:
• Cooling water:
• Output power:
• Input Power:
Control Port (Generator User port or DeviceNet port):
• Generator User port:
• DeviceNet port:
Note: If you use the DeviceNet interface, the interlocks still require external
contact closure between pin 11 and pin 12 of the Generator User port.
See
Before Enabling the Output
1. Be sure to complete the steps in
page
5-9.
2. Make sure the Standby/Stop switch on the front panel is in the Stop (down)
position.
3. Engage the rear circuit breaker.
Note: The front panel display should now activate.
4. Verify the desired regulation mode is selected by looking at the front panel Load
Regulation indicator.
ON = load power regulation mode is selected (this is the default).
OFF = Forward power regulation is selected.
FLASHING = The generator has been set to center frequency mode.
To change the regulation mode, see:
4 Command 12 in
5. Select the proper frequency band. See
for more information.
Enabling the Output
1. Be sure to have completed the steps listed in
Breaker" on page 5-9
5705211-C
"Connecting Cooling Water" on page
"Connecting I/O and Auxiliary Connectors" on page
"Connecting Input Power" on page
Table 4-1 on page
Table 4-8 on page
Table 4-7 on page
4-20.
"Before Engaging the Rear Circuit Breaker" on
Table 4-7 on page 4-20
and
"Before Enabling the Output" on page
Installation, Setup, and Operation
HFV 8000 Generator
5-5.
5-7.
4-2.
4-38.
"Setting the Frequency Band" on page 5-11
"Before Engaging the Rear Circuit
5-6.
5-9.
5-9