Dürkopp Adler 755 B Operating Instructions Manual page 237

Table of Contents

Advertisement

Programming
Adjusting and testing pick-up folder
 The display switches to Test pick-up folder.
Fig. 189: Testing pick-up folder
Symbol
To test the pick-up folder:
1. Press the
 Reference run is carried out.
2. Press the desired button.
Operating Instructions 755 B, 756 B/F - 00.0 - 02/2021
Meaning
Folder adjustment  p. 236
Pick-up folder depressurized On/Off
Pick-up folder Up/Down
Pick-up folder Left/Right
Reference
Folder drive position X-axis
• 0 - 6 mm
button.
235

Advertisement

Table of Contents
loading

This manual is also suitable for:

756 b756 f

Table of Contents