Dürkopp Adler 755 B Operating Instructions Manual page 222

Table of Contents

Advertisement

 The display switches to Loading process test.
Fig. 175: Loading process test
The sewing material is fed through the sewing path without sewing includ-
ing all functions stored in the seam program.
The loading process test is designed to check if the flaps and piping strips
are transported correctly through the sewing path.
Information
To monitor the transport path of the sewing material, reduce the insertion
speed prior to the loading process test
To perform a loading process test:
1. Press the Loading process test
 The machine boots up.
2. Perform a reference run.
 The load mode is active.
3. Insert the sewing material.
4. Press the pedal to close the transport clamp.
 The display shows the message
5. Press the right pedal.
 The loading process is completed without sewing by performing
6. To exit the test: access the menu Service > Machine test >
220
Loading process test
pedal strokes.
Machine workflow test again and press the
(
p. 163).
button.
Operating Instructions 755 B, 756 B/F - 00.0 - 02/2021
Programming
.
button.

Advertisement

Table of Contents
loading

This manual is also suitable for:

756 b756 f

Table of Contents