YOKOGAWA ZR22G User Manual page 11

Zirconia oxygen/humidity analyzer
Hide thumbs Also See for ZR22G:
Table of Contents

Advertisement

3.
Installation ................................................................................................. 3-1
3.1
Installation of General-purpose Detector ....................................................... 3-1
3.1.1
3.1.2
3.1.3
3.1.4
3.2
3.2.1
3.2.2
3.2.3
3.3
Installation of the ZR802G Converter ............................................................. 3-8
3.4
Installation of ZA8F Flow Setting Unit .......................................................... 3-10
3.5
Installation of ZR40H Automatic Calibration Unit ....................................... 3-11
3.6
Installation of the Case Assembly (E7044KF) ...............................................3-12
3.7
Insulation Resistance Test ............................................................................. 3-13
4.
Piping ......................................................................................................... 4-1
4.1
Piping for System 1 ........................................................................................... 4-1
4.1.1
4.1.2
4.1.3
4.1.4
4.2
Piping for System 2 ........................................................................................... 4-5
4.2.1
4.2.2
4.2.3
4.2.4
4.3
Piping for System 3 ........................................................................................... 4-7
4.4
Piping for the Detector with Pressure Compensation ................................ 4-10
4.4.1
4.4.2
4.4.3
5.
Wiring ......................................................................................................... 5-1
5.1
General ............................................................................................................... 5-1
5.1.1
5.1.2
5.1.3
5.2
Wiring ................................................................................................................. 5-5
5.2.1
5.2.2
5.2.3
5.2.4
5.2.5
5.2.6
Probe Insertion Hole .......................................................................... 3-1
Installation of the Detector ................................................................. 3-2
(K9471UC), Probe Protector ZO21R ................................................. 3-2
Installation of ZH21B Dust Protector ................................................. 3-4
Probe Insertion Hole .......................................................................... 3-6
Mounting of the High Temperature Detector ...................................... 3-7
Parts Required for Piping in System 1 ............................................... 4-2
Connection to the Calibration Gas Inlet ............................................. 4-3
Connection to the Reference Gas Inlet ............................................. 4-3
Piping to the High Temperature Probe Adapter ................................. 4-3
Piping Parts for System 2 .................................................................. 4-6
Piping for the Calibration Gas ............................................................ 4-6
Piping for the Reference Gas............................................................. 4-7
Piping to the High Temperature Probe Adapter ................................. 4-7
Piping for the Calibration Gas .......................................................... 4-11
Piping for the Reference Gas........................................................... 4-12
Wiring ................................................................................................. 5-3
Mounting of Cable Gland ................................................................... 5-4
Connection to Converter .................................................................... 5-5
Connection to Detector ...................................................................... 5-5
Power and Grounding Wiring............................................................. 5-6
Wiring for Power to Detector Heater .................................................. 5-7
Wiring for Detector Output ................................................................. 5-7
Wiring for Analog Output .................................................................... 5-9
Toc-2
IM 11M12G01-02EN
1sh Edition : Mar. 25, 2021-00

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zr802gZr202g

Table of Contents