Figure 50: Example of a site coverage floor plan
Obtaining site plans
Obtain two site plans or maps with dimensions marked.
Use one working copy to identify critical points, cell centers, and cell boundaries. Use
one clean copy to attach to the site provisioning record for the installer, customer, or
maintenance.
Gather building information
Gather the following information and enter it into the work order.
Gathering building information
1. Obtain and record building identification.
2. Obtain and record information about construction materials, such as walls, floors,
3. Record the type facilities, such as office, hotel, factory, store.
4. Record the number of floors in the building.
5. Record the height of floors.
6. Record as much information as you can obtain about the partitioning of floors.
SIP DECT Fundamentals
and ceilings.
If the building contains atriums, multiple floors, or floors not all the same shape or
unusual conditions, see
Deploying on multiple floors
Site planning example: Able-Studio
on page 58.
October 2012
201