KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 98

Table of Contents

Advertisement

Step 53: Attach Tunnel Wall Assembly
A: On the left side of the tunnel wall place 1 (6007) Wall Support beside the (6000) Upper Post. The top of the
(6007) Wall Support should be behind the (6030) Tunnel Side Top and the bottom end should be on the outside of
the (6017) Floor Support. Attach using 1 (H2) ¼ x 2" Hex Bolts (with flat washer, lock washer and t-nut) in tunnel
side and 1 (H3) ¼ x 2-1/2" Hex Bolt in Floor Support. (Fig. 53.1 & 53.2)
B: Repeat step A to install a second (6007) Wall Support on the right side of the tunnel wall. (Fig. 53.1 & 53.2)
C: Measure to ensure that there is a 17" (432mm) space between the 2 (6007) Wall Supports and attach 1 (6014)
Tunnel Spacer flush to the top of the floor boards with 5 (S11) #8 x 2" Wood Screws.(Fig. 53.1 & 53.2)
Fig. 53.1
6000
Wood Parts
2 x
Wall Support 1-1/4 x 3 x 43-1/8"
6007
1 x
Tunnel Spacer 1-1/4 x 3 x 16-15/16"
6014
Fig. 53.2
TN1
6030
6007
6012
6002
6014
Hardware
5 x
#8 x 2" Wood Screws
S11
2 x
¼ x 2-1/2" Hex Bolt (LW1, FW1, TN1)
H3
2 x
¼ x 2" Hex Bolt (LW1, FW1, TN1)
H2
98
17" (432mm)
TN1
H2
TN1
LW1
H3
FW1
FW1
LW1
H2
flush to
floor boards
FW1
LW1
H3
S11
x 5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents