KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 69

Table of Contents

Advertisement

Step 31: Attach Roof Ends
Part 2
C: On the Back of the fort place 1 (2684) Mid Roof End flush to the top of each (2677) Narrow Panel centred over
the pilot holes then measure 1-1/4" down from the top of the panel and attach from the inside with 1 (S4) #8 x 3"
Wood Screw and from the outside with 1 (S3) #8 x 2-1/2" Wood Screw per Mid Roof End. (fig. 31.4 and 31.5)
D: On the Front of the fort place 1 (2684) Mid Roof End flush to the top of each (2677) Narrow Panel centred over
the pilot holes then measure 1-1/4" down from the top of the panel and attach from the inside with 1 (S4) #8 x 3"
Wood Screw and from the outside with 1 (S3) #8 x 2-1/2" Wood Screw per Mid Roof End. (fig. 31.4 and 31.6)
Fig. 31.4
2646
2677
2684
Flush
2618
Back
2684
Flush
2677
2647
Wood Parts
4 x
Mid Roof End 1-1/4 x 4-7/8 x 7"
2684
Swing Wall
2627
Flush
Flush
2622
Left Side
4 x
4 x
2647
S4
2677
2684
2618
Front
2684
S4
2677
2646
2677
Hardware
#8 x 2-1/2" Wood Screw
S3
#8 x 3" Wood Screw
S4
69
Fig. 31.5
Back
2618
Fig. 31.6
Flush
Front
Flush
2684
2677
S3
2618
2684
S3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents