KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 82

Table of Contents

Advertisement

Step 40: Lower Frame Assembly
Part 2
C: Place 1 (6002) Long Post and 1 (6026) Rock Rail side by side with the (6002) Long Post on the right side,
notched end at the top and facing the inside and the (6026) Rock Rail on the left. Make sure that the angled cut on
the (6026) Rock Rail is at the top, facing inwards towards the (6002) Long Post. (Fig. 40.3 & 40.5)
D: From the underside of the assembly place 1 (6017) Floor Support making sure the pre-drilled holes match what
is shown on fig.(Fig. 40.3). Attach using 2 (H3) ¼ x 2-1/2" Hex Bolts (with lock washer, flat washer and t-nuts). (Fig.
40.3 & 40.4)
E: Place 1 (6018) Long Ground across the bottom of both pieces so that it's flush with the ends of the (6002) Long
Post and the (6026) Rock Rail. Attach (6018) Long Ground using 2 (H2) ¼ x2" Hex Bolts (with lock washer, flat
washer and t-nuts). (Fig. 40.3 )
F: On the underside of the (6018) Long Ground place 1 (0369) Lower Diagonal tight and flush to the (6002) Long
Post and the (6018) Long Ground. Attach through (6018) Long Ground with 2 (H2) ¼ x 2" Hex Bolts (with lock
washer, flat washer and t-nut). Pre-drill upper hole of (0369) Lower Diagonal with a 1/8" (3.2mm) drill bit and install
1 (LS3) 1/4 x 3" Lag Screw (with flat washer). (fig. 40.3)
Fig. 40.3
H3
left view
LW1
Fig. 40.4
Wood Parts
1 x
Long Post 1-1/4 x 3-1/4 x 77-1/2"
6002
1 x
Floor Support 1-1/4 x 3-1/4 x 34-1/2"
6017
1 x
Long Ground 5/8 x 4-1/2 x 62"
6018
1 x
Rock Rail 1-1/4 x 2-3/4 x 71-15/16"
6026
1 x
Lower Diagonal 1-3/8 x 2-1/2 x 37"
0369
6002
6017
6026
H3
FW1
TN1
Fig. 40.5
right view
3 x
2 x
1 x
LS3
FW1
6018
H2
Hardware
1/4 x 2" Hex Bolt (LW1, FW1, TN1)
H2
¼ x2-1/2" Hex Bolts (LW1, FW1, TN1)
H3
¼ x 3" Lag Screw (FW1)
LS3
82
H2
LW1
0369
FW1
TN1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents