KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 97

Table of Contents

Advertisement

Step 52: Attach SL Brace
A: On the left side wall, place 1 (6022) SL Brace against the (6017) Floor Support making sure that it's flush with
the top of the floorboards. Attach using 2 (H3) ¼ x 2-1/2" Hex Bolt (with flat washer, lock washer and t-nut). (Fig.
52.1 & 52.2 & 52.3)
B: Center the (6005) Slide Block vertically in the slide opening ensuring that it's flush to the bottom of (6022) SL
Brace and attach to the (6017) Floor Support using 2 (S11) #8 x 2" Wood Screws. (Fig. 52.1 & 52.2 & 52.3)
C: From inside the assembly place 1 (6032) TNR Wall so it's pressed against the inside of the (6005) Slide Block,
(6026) Rock Rail and (6002) Long Post. Ensure that the bottom of the (6032) TNR Wall is flush with the bottom of
the (6005) Slide Block and attach with 7 (S11) #8 x 2" Wood Screws. (Fig. 52.1 & 52.2 & 52.3).
Fig. 52.1
left side wall
6022
6005
6032
Wood Parts
1 x
SL Brace 1-1/4 x 2-1/2 x 24-1/4"
6022
1 x
TNR Slide Block 1-1/4 x 3-1/4 x 8-3/4"
6005
1 x
TNR Wall 1-1/4 x 4-1/4 x 34-3/4"
6032
Fig. 52.2
inside
S11
Fig. 52.3
FW1
LW1
H3
6017
6032
S11
Hardware
9 x
#8 x 2" Wood Screws
S11
2 x
¼ x 2-1/2" Hex Bolt (LW1, FW1, TN1)
H3
97
TN1
6032
Flush
6026
6005
6022
Flush
flush to
floor board
H3
center in
LW1
slide opening
FW1
S11
6002

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents