KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 36

Table of Contents

Advertisement

Step 10: Install Ground Stakes
A: In the 5 places shown in fig. 10.1 drive the Rebar Ground Stakes 13" into the ground against outside front
corner of (2622) End Panel Assembly, on both (2607) Diagonals and both (2613) Heavy SW Posts. Be careful not
to hit the washer while hammering stakes into the ground as this could cause the washer to break off.
B: Attach ground stakes using 1 (S7) #12 x 2" Pan Screw per ground stake (fig. 10.2 and 10.3).
C: After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
be driven 13" into ground. Digging or driving stakes can be dangerous if you
do not check first for under-ground wiring, cables or gas lines.
Fig. 10.1
2622
Front
MOVE FORT TO FINAL LOCATION PRIOR TO STAKING
FINAL LOCATION MUST BE LEVEL GROUND
Warning!
To prevent tipping and avoid potential injury, stakes must
2607
2607
5 x
2613
Hardware
#12 x 2" Pan Screw
S7
36
Fig. 10.2
Fig. 10.3
S7
Rebar
Ground
Stake
Other Parts
5 x Rebar Ground Stake
2622
S7
Rebar
Ground
Stake

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents