KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 43

Table of Contents

Advertisement

Step 15: Attach Rock Wall Assembly to Fort
Part 1
A: Place Rock Wall Assembly centred in opening shown on the Fort Guide at the end of the instructions and flush
as shown below. Attach (0349) Rock Rails using 4 (S11) #8 x 2" Wood Screws. (fig. 15.1 and 15.2)
B: Attach 1 (2605) Access Board to top of Rock Wall Assembly, flush to top of (0349) Rock Rail using 4 (S2) #8 x
1-1/2" Wood Screws. (fig. 15.3)
Fig. 15.1
S11
0349
Use #8 x 1½" Wood Screws to attach Rock Boards to Rails
Use #8 x 1" Pan Screws + 1/4 x 1¼ Pan Bolt
(1/4 lc wash, 3/16 flat wash, 1/4 barrel Nut) to attach Rocks to Rock Board
Use #8 x 2" Wood Screws to attach Rock Rail to fort - flush to top edge
Re-attach top Access Board to Rock Rails
Wood Parts
1 x
Access Board 1 x 6 x 19-3/4"
2605
Back
Panel
S11
Fig. 15.3
2605
S2
0349
S2
Back
Panel
Flush
Hardware
4 x
#8 x 1-1/2" Wood Screw
S2
4 x
#8 x 2" Wood Screw
S11
43
Fig. 15.2
Flush
SIZE
DWG. NO.
A
Details
SCALE:1:50
WEIGHT:
SIZE
DWG. NO.
A
SCALE:1:50
WEIGHT:
0349
S11
REV.
0349
SHEET 1 OF 1
REV.
Details
SHEET 1 OF 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents