KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 81

Table of Contents

Advertisement

Step 40: Lower Frame Assembly
Part 1
A: Place 1 (6002) Long Post and 1 (6026) Rock Rail side by side with the (6002) Long Post on the left side
making sure that the notched out end is at the top and on the inside. It is important to ensure that the angled cut
on the (6026) Rock Rail is at the top, facing inwards towards the (6002) Long Post. Place 1 (6020) Short Ground
across the bottom of both pieces so that it's flush with the ends of the (6002) Long Post and the (6026) Rock
Rail. Attach using 2 (H2) ¼ x 2" Hex Bolts (with lock washer, flat washer and t-nuts). (Fig. 40.2)
B: From the underside of the assembly place 1 (6017) Floor Support making sure the pre-drilled holes match
what is shown on fig.(Fig. 40.2). Attach using 2 (H3) ¼ x 2-1/2" Hex Bolts (with lock washer, flat washer and
t-nuts). (Fig. 40.1 & Fig. 40.2)
Fig. 40.2
add 1/4" T-Nut to inside
of Long Post
H2
Flush
TN1
Wood Parts
1 x
Long Post 1-1/4 x 3-1/4 x 77-1/2"
6002
1 x
Floor Support 1-1/4 x 3-1/4 x 34-1/2"
6017
1 x
Short Ground 5/8 x 4-1/2 x 44-1/8"
6020
1 x
Rock Rail 1-1/4 x 2-3/4 x 71-15/16"
6026
D
LW1
FW1
6002
6020
H2
Flush
TN1
Fig. 40.1
H1
LW1
FW1
H3
LW1
FW1
TN1
6017
6026
LW1
FW1
Hardware
2 x
1/4 x 2" Hex Bolt (LW1, FW1, TN1)
H2
2 x
¼ x 2-1/2" Hex Bolts (LW1, FW1, TN1)
H3
81
add 1/4" T-Nut to inside
of Long Post
TN1
H3
LW1
FW1
TN1
square each sub assembly
2 angles shown, pick the best one

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents