Step 67: Install Ground Stakes
A: In the 4 places shown in (fig. 67.2) drive the Rebar Ground Stakes 13" (330mm) into the ground against the
boards. Be careful not to hit the washer while hammering stakes into the ground as this could cause the washer to
break off.
B: Attach 1 ground stake to each (6026) Rock Rail, the (6002) Long Post and to (0369) Lower Diagonal using 1
(S7) #12 x 2" Pan Screw per ground stake as shown in (fig. 67.1 & 67.2)
C: After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
Warning!
To prevent tipping and avoid potential
injury, stakes must be driven 13" (330mm) into ground.
Digging or driving stakes can be dangerous if you do
not check first for under-ground wiring, cables or gas
lines.
Fig. 67.1
S7
13"
(330mm)
Into Ground
Rebar Ground
Stakes
Hardware
4 x
#12 x 2" Pan Screw
S7
Fig. 67.2
6026
6002
0369
118