KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 102

Table of Contents

Advertisement

Step 57: Tunnel Frame Assembly
Part 1
A: Place 2 (6035) Tunnel Side Joists side by side making sure that the pre-drilled holes for the t-nuts are at the
top. Install 1 5/16" T-Nut on the inside of all 4 ends. (fig. 57.1 and 57.2)
Fig. 57.1
Wood Parts
2 x
Tunnel Side Joist 1-1/4 x 3-1/4 x 69-11/16"
6035
Notice hole orientations
Fig. 57.2
Hardware
4 x 5/16" TN2
102
TN2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents