KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 77

Table of Contents

Advertisement

Step 37: Attach Roof Assemblies to Fort
Part 3
E: With 2 people on the ground and at least 1 person in the fort, lift the Large Roof Assembly up and over the
Back side of the fort. Guide the Roof Assembly onto the fort so all four (2617) Roof Supports sit flush to the front
and outside edges of each (2793) Long Roof End. (fig. 37.5 and 37.6)
F: Attach (2617) Roof Supports to each (2793) Long Roof End with 1 (S3) #8 x 2-1/2" Wood Screw per support.
(fig.37.5 and 37.6)
Fig. 37.5
Flush
2793
S3
4 x
2617
Hardware
#8 x 2-1/2" Wood Screw
S3
77
2617
Fig. 37.6
S3
S3
2793

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents