KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 31

Table of Contents

Advertisement

Step 5: Attach SW Ground and Diagonal
A: Loosely attach 1 (2606) SW Ground to each (2607) Diagonal with 1 (H10) 1/4 x 2-1/4" Hex Bolt (with lock
washer, flat washer and t-nut) per board then place each (2607) Diagonal tight and flush to the front of (2627) SW
Wall Panel. (2606) SW Grounds to be flush to the bottom of (2627) SW Wall Panel. (fig. 5.1 and 5.2)
B: Pre-drill pilot hole with a 3/16" drill bit then attach each (2607) Diagonal to (2627) SW Wall Panel with 1 (LS3)
1/4 x 3" Lag Screw (with flat washer) per board, checking that they remain flush to outside edge. (fig. 5.1 and 5.2)
C: Make sure bottom of each (2606) SW Ground is flush to bottom of (2627) SW Wall Panel then attach with 2
(S11) #8 x 2" Wood Screws and 1 (S4) #8 x 3" Wood Screw per board. Tighten all bolts. (fig. 5.1 and 5.2)
Fig. 5.1
Wood Parts
2 x
SW Ground 5/4 x 4 x 14-1/4"
2606
2 x
Diagonal 1-1/4 x 3 x 22"
2607
2627
2 x
2 x
2 x
4 x
2627
S11
Flush
S4
Hardware
1/4 x 2-1/4" Hex Bolt (LW1, FW1, TN1)
H10
1/4 x 3" Lag Screw (FW1)
LS3
#8 x 3" Wood Screw
S4
#8 x 2" Wood Screw
S11
31
FW1
Flush
H10
2606
Fig. 5.2
LS3
2607
TN1
FW1
LW1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents