KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 84

Table of Contents

Advertisement

Step 42: Floor Assembly
A: Place (6003) Floor Joist flush to the underside of the (6013) Floor Board and centred over the pilot holes in the
(6034) Floor Back and (0600) Bottom Trim. The angle cut should be flush with the (0600) Bottom trim
and 42.2 and
42.3). Attach using 2 (S11) #8 x 2" Wood Screws per side.
B: Evenly Space the remaining (6013) floor boards and attach each board using 5 (S20) #8 x 1-3/8" Wood Screws
per
board.(Fig. 42.4 and
Fig. 42.1
6034
E
C-C
C
Fig. 42.4
x 5 per
S20
board
C
Wood Parts
1 x
Floor Joist 15/16 x 2 x 33-15/16"
6003
6 x
Floor Board 5/8 x 4-1/4 x 21"
6013
42.5).
6013
6042
6003
E
6013
SECTION
C-C
4 x
40 x
0600
6042
Hardware
#8 x 2" Wood Screws
S11
#8 x 1-3/8" Wood Screws
S20
84
(Fig. 42.1 and 42.2 and 42.3)
Fig. 42.2
centred
Fig. 42.3
flush to the
underside
S20
Fig. 42.5
6042
(Fig. 42.1
x 2
S11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents