KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 104

Table of Contents

Advertisement

Step 58: Attach Floor Boards
A: Flip the frame assembly so that it's right side up. (fig. 58.1)
B: Place 1 (10077) Floor Board at the end of the tunnel frame so it's flush with the ends and the sides of the
(6035) Tunnel Side Joists and attach using 5 (S2) #8 x 1-1/2" Wood Screws. (fig. 58.1 and 58.2)
C: Place 1 (10078) Floor Board at the other end of the tunnel frame ensuring that it's flush with the ends and the
sides of the (6035) Tunnel Side Joists and attach using 5 (S2) #8 x 1-1/2" Wood Screws. (fig. 58.1 and 58.2)
D: Evenly space the remaining (10077) Floor Boards and attach all boards using 5 (S2) #8 x 1-1/2" Wood Screws
per board. (fig. 58.1 and 58.2)
Fig. 58.1
Flush
10077
x 14
Fig. 58.2
Wood Parts
14 x
Floor Board 5/8 x 4-1/2 x 16-7/8"
10077
1 x
Floor Board 5/8 x 3-3/4 x 16-7/8"
10078
14 wide & 1 narrow floor boards
1-1/5" WS's X75
Note: Pre-drill center holes
with 3/16" drill bit.
75 x
Evenly Space
Hardware
#8 x 1-1/2" Wood Screw
S2
104
x 5 per board
S2
Flush
10078

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents