Step 3: Join Frame Assemblies
Part 3
C: With at least two helpers lift the two wall assemblies so the (2792) Ground Braces meet the (2608) Floor Joist
as shown in fig. 3.5.
D: Place 1 (2618) Front Back Panel between the 2 (2677) Narrow Panels on the outside of the (2792) Ground
Braces and (2608) Floor Joists on the front and back walls then from the inside of the assembly attach (2792)
Ground Braces and (2608) Floor Joists to each (2618) Front Back Panel with 4 (S11) #8 x 2" Wood Screws per
panel. (fig. 3.5)
Fig. 3.5
2677
2792
Wood Parts
2 x
Front Back Panel 1-1/4 x 42 x 87"
2618
Back
2618
S11
x 4 per side
Front
Tight
Hardware
8 x
#8 x2" Wood Screw
S11
25
2677
2608
Tight