KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 112

Table of Contents

Advertisement

Step 63: Build Tunnel Assembly
Part 3
F: Join the 2 Tunnel Sides together so the tops are tight together and attach with 12 (MB1) #12 x ½" Pan Bolts
(with #12 Lock Nut). (fig. 63.6 and 63.7)
Fig. 63.6
Fig. 63.7
x 12
MB1
Hardware
12 x
#12 x 1/2" Pan Bolt (LN4)
MB1
112
x 12
LN4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents