KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 131

Table of Contents

Advertisement

Step 75: Attach Elbow Assembly to Flange Assembly
Part 1
Note: When installing Pan Bolts make sure to look at holes so bolts go through the side with the
round recess and the lock nuts go through the side with the hexagonal recess. Keep all bolts loose
until further step.
A: Fit one of the Elbow Assemblies to the Flange Assembly by lining up the arrows on each assembly. (fig.
75.2 and 75.3)
B: Attach 1 TNR2 Slide Clamp Ring to the top of the joined Assemblies using 3 (PB1) 1/4 x 3/4" Pan Bolts
(with LN1 lock nut), making sure to match the arrows up with the end of the clamp ring (where a seam will be)
as shown in fig. 75.2 and 75.3.
Use Quadrex Driver as a guide pin for each hole before inserting bolt. (fig. 75.3)
Fig. 75.1
DO NOT USE
USE IMAGE
LN1
Do not install bolt
in Clamp Ring ends
until Step 75D
Fig. 75.2
Flange
Assembly
Top Slide Bolt Holes
3 x
PB1
Fig. 75.4
LN1
PB1
Hardware
1/4 x 3/4" Pan Bolt
(LN1 lock nut)
131
Quadrex Driver
Use special driver provided
in locations where the curve
of the elbow are difficult to
reach with a standard driver.
Fig. 75.3
Align each elbow using the
molded arrows with the seam
of the clamp ring.
Elbow
Assembly
Other Parts
1 x Quadrex Driver
1 x TNR2 Slide Clamp Ring

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents