KidKraft Cedar Summit BEAR CAVE LODGE FSC Installation And Operating Instructions Manual page 21

Table of Contents

Advertisement

Step 2: Frame Assembly
Part 1
It is important to assemble the frame on a flat, smooth surface.
A: Place (2627) SW Wall Panel between 2 (2677) Narrow Panels noticing the panel orientations. The tops and
bottoms of the panels should be flush. Make sure the panels are square then using the pilot holes as a guide
pre-drill with a 3/16" drill bit and fasten the front (2677) Narrow Panel to (2627) SW Wall Panel and (2627) SW
Wall Panel to the back (2677) Narrow Panel with 4 (WL5) 1/4 x 2-1/2" Wafer Lags per side. (fig. 2.1, 2.2 and 2.3)
Fig. 2.1
Top View
Front
Notice front
(2677) Narrow
Panel overlaps
(2627) SW Wall
Panel
WL5
Flush
Front
Fig. 2.2
Flush
2627
Swing Side
Notice counter sunk
holes on the outside
Wood Parts
2 x
Narrow Panel 1-1/4 x 22 x 87"
2677
1 x
SW Wall Panel 1-1/4 x 42 x 87"
2627
2677
2627
Swing Side
2677
8 x
Back
Notice (2627) SW Wall
Panel overlaps back
(2677) Narrow Panel
Flush
WL5
Notice grooves
face inwards
Back
Flush
Hardware
1/4 x 2-1/2" Wafer Lag
WL5
21
Fig. 2.3
2677
WL5
x 4 per
side

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F29370

Table of Contents