Mitsubishi Electric NZ2GN2S1-16D User Manual page 190

Programmable controller; cc-link ie tsn remote i/o module; cc-link ie tsn communication mode
Hide thumbs Also See for NZ2GN2S1-16D:
Table of Contents

Advertisement

4.
Display "CC-Link IE TSN Configuration" window and configure the settings as follows.
[Navigation window]  [Parameter]  [Module Information]  Model  [Basic Settings]  [Network Configuration
Settings]
5.
Select [Close with Reflecting the Setting] and close the "CC-Link IE TSN Configuration" window.
6.
Display the refresh parameter setting window and configure the setting as follows.
[Navigation window]  [Parameter]  [Module Information]  Model  [Basic Settings]  [Refresh Settings]
7.
Click the [Apply] button.
8.
Write the set parameters to the CPU module of the master station and reset the CPU module of the master station, or
turn off and on the power supply of the programmable controller.
[Online]  [Write to PLC]
9.
Set the CPU module of the master station to RUN, and check that the DATA LINK LED of the I/O module is turned on.
9 PROGRAMMING
188
9.2 Program Example

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents