Husky Altanium Matrix5 User Manual page 96

Table of Contents

Advertisement

The Mold Diagnostic screen fields, selections, and buttons are described in
Table 8-1
Validate Zone After
Zone Cooling Time
Maximum Test Time
Heaters (test)
Sensors (test)
Wiring (test)
Run Test (button)
Stop Test (button)
View Test Results
(button)
Test Status
Start Time
Elapsed Time
84
v 1.0 — February 2020
Mold Diagnostics Screen Field and Button Descriptions
Field/Button
The number of degrees that a zone must heat above its start
temperature to pass a test.
The amount of time to wait after a test completes before the system
starts the next test.
The maximum test duration.
In the Select Tests area of the screen, select the Heaters check box to do
the heater current draw test of the selected zones. The Heaters test:
In the Select Tests area of the screen, select the Sensors check box to do
the thermocouple sensor test of the selected zones to make sure that the
thermocouples function correctly. The test makes sure that the sensor is
not lost or has its wiring reversed.
In the Select Tests area of the screen, select the Wiring check box to do
a thermocouple and heater pairings test for the selected zones. The test
makes sure the pairings are correct, such as 1 to 1, 2 to 2, and so on. The
wiring test does what follows:
Touch the Run Test button to start the selected tests. The tests are done
only on the selected zones.
Touch the Stop Test button to stop the test. The results for completed
tests are recorded in the database. The test results can be reviewed at a
later time.
Touch the View Test Results button to open the Test Results screen.
This can be done during the test after the first zone has completed or
after the test has completed.
The field shows the current status of the test. During the test, it shows the
zone test operation.
The time that the test was started.
The amount of time that has elapsed since the test was started.
Records the maximum current and voltage, and then calculates the
resistance.
Does a test for open fuses.
Before the Altanium does the cross talk test, it waits for the
temperature to be below the threshold for the cross talk test.
As the mold heats, the system records the maximum current and
voltage, and then calculates the resistance.
Makes sure all cross talk is works correctly.
Table
Description
Altanium Matrix5
8-1.
Testing the Mold

Advertisement

Table of Contents
loading

Table of Contents