Husky Altanium Matrix5 User Manual page 216

Table of Contents

Advertisement

Figure 15-11 Fuse Location
8.
9.
10. Remove the lock out equipment and tag from the main power switch.
11. Energize the system at the main power switch.
204
Slide the new card into to the slot and push the card slowly and firmly back into place.
An incorrectly oriented card will not seat properly.
Tighten the upper and lower slotted fasteners on the heat sink.
v 1.0 — February 2020
Altanium Matrix5
Replace an Open Fuse on an Intelligent Control Card

Advertisement

Table of Contents
loading

Table of Contents