Other Operations For The Hart Configuration Tool - YOKOGAWA ADMAG AXR User Manual

Two-wire magnetic flowmeter integral flowmeter
Table of Contents

Advertisement

b. Confirm the new HART protocol revision
number
Call up the Universal rev parameter, and confirm
that the new HART revision number is displayed.
• Procedure to call up the Universal rev.
parameter.
DD
Device Setup → Detailed setup
→ Device information → Field
device information → Revision #'s
→ Universal rev →
DTM
Configuration → HART →
Universal rev. →
5
HART protocol revision: 5
7
HART protocol revision: 7
HART protocol revision can also be confirmed on
the second line and third line of the device display.
• Procedure to call up the Display Select
Second
DD
Device setup → Detailed setup →
line
Function Set → Display → Display
Select2
DTM
Configuration → Display Set →
Display Select2
Third
DD
Device setup → Detailed setup →
line
Function Set → Display → Display
Select3
DTM
Configuration → Display Set →
Display Select3
Protocol Revision
HART Protocol Revision 5
HART Protocol Revision 7
8.8.6 Other operations for the HART
configuration tool
Regarding other operations for the HART
configuration tool, read the HART configuration tool
operations manual.
<8. OPERATION VIA HART CONFIGURATION TOOL (HART 5)>
Displayed on AXR screen
HART5
HART7
8-7
IM 01E30D01-01EN

Advertisement

Table of Contents
loading

Table of Contents