NOTE
When to Verify
NOTE
Performance Verification
Verification Overview
The verification procedures in this chapter work for all 8510 and 8510XF
hardware configurations by substituting the proper 8510 source, test set,
accessories, and millimeter wave controller.
Performance verification software Rev. A.05.01 or greater is available in
DOS or LIF format, and will work with laptops or PCs that have the required
accessories installed. Refer
After installation of the system is complete, a performance verification is
necessary to assure proper system operation. This initial verification is
included with the installation.
After the initial verification, the verification should be repeated once a year.
This recommended interval assumes that Agilent cables are used with the
system.
If non-Agilent cables, adaptors, or other fixtures are used, the verification
schedule must be determined by the user, as the characteristics of these
devices are unknown. In establishing a verification schedule, the following
factors should be considered:
•
Frequency of use
•
Amount of cable movement
•
Amount of drift occurring between prior verifications
Performance verification of a system performed at long intervals is not to be
confused with measurement calibration. Measurement calibration typically
is performed on a daily basis, or when measurement setup or conditions have
changed.
4-2 8510XF Network Analyzer Systems
to"Materials Required" on page
4-3.