Agilent Technologies 8510XF Operating And Service Manual page 43

Network analyzer systems 2 to 85 ghz and 2 to 110 ghz
Hide thumbs Also See for 8510XF:
Table of Contents

Advertisement

Ramp anchor bolt (Item D)
Ramp end flap
(hinged to ramp) (Item E)
Figure 2-7
WARNING
Replacing the Anchor Bolt
Unload the system
1. Pull out the two bolts (item A) from the base using a screwdriver or
pliers. See
Figure 2-5 on page
2. Remove the brace assembly (item B).
3. Lift the hinged slat (item C) and remove the ramp anchor bolt (item D).
See
Figure 2-6 on page
4. Place one end of the ramp on the ramp ledge. See
5. Insert the ramp anchor bolt and fold down the hinged slat. To secure the
ramp, you may place long wood screws through the ramp and into the
ramp edge.
6. Fold down the ramp's end flap (item E).
A racked system is tall and top-heavy. It is easy to tip the rack over while
moving it, which could result in personal injury or death. Unloading the system
safely requires the participation of four persons, and they must exercise care
to prevent the rack from tipping over.
2-14.
2-14.
8510XF Network Analyzer Systems 2-15
Installation
Unpacking the System
Figure 2-7
above.

Advertisement

Table of Contents
loading

This manual is also suitable for:

E7340aE7342aE7350aE7352a

Table of Contents