Switching On The Device For The First Time; General Information Before Switching On The Device; Switching On The Device - B&R Panel PC 2100 User Manual

Built-in devices
Hide thumbs Also See for Panel PC 2100:
Table of Contents

Advertisement

Installation • Switching on the device for the first time

5 Switching on the device for the first time

5.1 General information before switching on the device

Checklist
The following items must be checked before the device is put into operation for the first time:
• Have the installation notes as specified in "Installation" on page 164 been observed.
• Have the permitted environmental conditions been taken into consideration for the device?
• Is the power supply connected correctly, and have the associated values been checked?
• Is the ground cable connected correctly to the ground connection?
• The device must be put into operation first before additional hardware is installed.
Caution!
Before the device is put into operation, it must first be acclimated to room temperature! It should not
be immediately subjected to thermal radiation.
If transported at low temperatures or if there are large temperature fluctuations, the device must not
be subjected to any type of moisture.
Prerequisites and requirements
The following requirements must be fulfilled before the device is switched on for the first time:
• The functional ground connections must be kept as short as possible and connected to the central ground-
ing point using the largest possible wire cross section.
• All connection cables must be connected correctly.
• A USB keyboard and USB mouse must be connected (optional).

5.2 Switching on the device

Procedure
1. Connect and switch on the voltage supply (e.g. power supply).
2. The device is switched on and booting; the power LED is lit.
180
Panel PC 2100 user's manual V1.11

Advertisement

Table of Contents
loading

Table of Contents