Operating Instructions
Single-pole conductor-rail system
SingleFlexLine Program 0815
Fig. 6: PE
principle
plus
Fig. 7: Conductor-rail
5
5
4
4
2
2
3
3
Fig. 8: Anchor point cap
BAL0815-0002d-US
www.conductix.us
2
2
translated document
PE
variant is used with error prevention. For PE
plus
the insulation is opened wider for a broader PE
The wider PE
collector brushes mostly prevent (without
plus
use of force or crash) the dip of the collector brush in a phase
rail. PE
end caps are also wider open and recognizable by
plus
their green color.
PH = phase conductor
PE = Protective conductor
PE
= protective conductor with error prevention
plus
Fixed point cap
For mechanical fixing of the conductor-rail to the installation
structure. Use of mechanical fixing on expanding sections
with long systems.
1 = Engagement cam
2 = Anchor point cap
3 = Hanger clamp
4 = Guideway profile
5 = Screw
The fixed-point caps must be used with a hanger clamp
screwed to the guideway profile.
rails
plus
brush.