Timing The Quality Control Unit/Discharge Unit - Sacmi PMV 224 Maintenance And Operation Manual

Machine for forming liners inside plastic caps
Table of Contents

Advertisement

176.12
.A03
8
MAINTENANCE
8.2.1.5

Timing the quality control unit/discharge unit

- Remove a sensor from the quality control unit (5) and put the tool (13) in its place.
- Place the centering ring (7) near the tool (13).
- Using the handwheel, run the quality control unit until the centering ring is brought to the point where the caps are
passed from the quality control unit to the discharge unit (6) .
- The discharge unit must perfectly coincide with the centering ring (7) in the point mentioned above.
- This may not happen for two reasons:
a) The two halves of the discharge unit's wheel are not properly set.
During machine testing the two wheels are set, secured in place with screws (18) and drilled so that they can be
correctly positioned with a special fixture without having to remove the sensing spindle.
b) The discharge unit is not timed with the quality control unit.
- In case "a", simply:
- loosen the screws (18);
- correctly position the two parts of the wheel with the tool provided;
- fully tighten the screws (18) again.
- In case "b", simply:
- loosen the screws (17);
- turn the discharge unit until it is in the correct position;
- fully tighten the screws (17).
FIGURE 8.2.1.5 - TIMING THE QUALITY CONTROL UNIT/DISCHARGE UNIT
5
Quality control unit
6
Discharge unit
7
Centering ring
13 Tool
17 Bolt
18 Bolt
8 - 22
Revision 01 Date 14.11.2001
13
18
17
7
6
5
T2433

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pmv 238

Table of Contents