Timing The 2Nd Turn-Table/Quality Control Unit - Sacmi PMV 224 Maintenance And Operation Manual

Machine for forming liners inside plastic caps
Table of Contents

Advertisement

8.2.1.4

Timing the 2nd turn-table/quality control unit

- Remove a sensor from the quality control unit (5) and put the tool (13) in its place.
- Place the centering ring (7) in a cavity that holds a cap on the 2nd transfer turntable (4).
- Using the handwheel, run the second turn-table until the space which holds the centering ring is brought to the point
where the caps are passed from the turn-table to the quality control unit.
- The tool (13) must perfectly coincide with the centering ring (7) in the point mentioned above.
If it does not happen:
- loosen the bolts (10) which hold the gear wheel (12) in place;
- turn the quality control unit, until the correct position is reached;
- fully tighten the bolts (10).
FIGURE 8.2.1.4 - TIMING THE 2ND TURNTABLE/QUALITY CONTROL UNIT
4
2nd transfer turntable
5
Quality control unit
7
Centering ring
10 Bolt
12 Gear wheel
13 Tool
Revision 01 Date 14.11.2001
5
10
12
176.12
MAINTENANCE
4
13
7
.A03
8
T2432
8 - 21