4.3

CONNECTIONS

4.3.1

CONNECTING THE HOSES FOR THE COOLING SYSTEM

4.3.1.1

Hoses for joining the heat-exchanger to the auxiliary circuit tank

The delivery and return hoses (2M & 2R respectively), which are attached to the heat-exchanger of the tank (A), lead
to the extruder base and must be connected to the delivery and return manifolds (M & R respectively).
4.3.1.2
Hoses for joining the chiller to the manifolds (M & R)
The delivery and return hoses (3M & 3R respectively), which run from the chiller, have to be connected to the delivery
and return manifolds (M & R respectively) as shown in the diagram.
NOTE:
These connections are to be made by the customer.
FIGURE 4.3.1 - CONNECTING THE HOSES FOR THE COOLING SYSTEM
3R
2R
Revision 01 Date 14.11.2001
3M
2M
A
176.12
INSTALLATION
2R
2M
3R
Chiller
.A03
4
3M
T2481
4 - 9