Attach Cross Support - KidKraft Cedar Summit Canyon Ridge Installation And Operating Instructions Manual

Table of Contents

Advertisement

Step 16: Attach Cross Support
Pre-drill all holes using a 3/16" drill bit before
installing the lag screws.
A: To adjust for uneven ground, raise or lower the
(160) Support Cross on the (152) SW Post. Make sure
the Support Cross is level prior to attaching with the lag
screws. (fig. 16.1 and 16.2)
B: Place (160) Support Cross between (152) SW
Posts at the previously determined spot and fasten with
1 (LS9) 5/16 x 4-3/4" Lag Screw (with flat washer) per
side. (fig. 16.2 and 16.3) Notice one side is fastened
on the outside and one on the inside. It is important
that each side is positioned exactly the same as the
diagram. (fig. 16.3) Tighten the lag screw when
you are sure (160) Support Cross is level.
C: Attach 1 (WB8) 5/16 x 2-3/8" Wafer Bolt (with flat
washer and t-nut) to (160) Support Cross through
the middle hole. (fig. 16.2 and 16.3) IMPORTANT!
MAKE SURE THE BOLT IS ATTACHED TO MINIMIZE
CHECKING OF WOOD.
Fig. 16.3
152
5/16" Flat
Washer
Wood Parts
1 x
Support Cross 2-1/2 x 3 x 51"
160
5/16" Flat
Washer
5/16" T-Nut
5/16" Flat
Washer
WB8
LS9
Hardware
2 x
5/16 x 4-3/4" Lag Screw
LS9
(5/16" flat washer)
1 x
5/16 x 2-3/8" Wafer Bolt
WB8
(5/16" flat washer, 5/16" t-nut)
51
Fig. 16.1
Fig. 16.2
LS9
160
152

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents