Attach Swings - KidKraft Cedar Summit Canyon Ridge Installation And Operating Instructions Manual

Table of Contents

Advertisement

Step 51: Attach Swings
A: Using 1 Threaded Quick Link per chain, join 1 Long Swing Chain to each side of the Swing Belt Seat.
Make sure to close the Threaded Quick Link tightly using an adjustable wrench. (fig. 51.1 and 51.2).
B: Using 1 Threaded Clip per chain, join the Short Swing Chain to the Acro Bar and Acro Handle. Make sure
to close the Threaded Clip tightly using an adjustable wrench. (fig. 51.2 and 51.3)
C: Attach the other end of the swing chains to the Spring Loaded Quick Links attached to the Heavy Duty
Swing Hangers. (fig. 51.1)
Caution: Threaded Quick Links
must be installed with the gate
completely down covering
the threads and tighten as
instructed. (fig. 51.2)
Fig. 51.2
Threaded Quick Links
attach to seat and Acro
bar.
Fig. 51.1
Swing Seat
Tighten Threaded Quick
Link using adjustable
wrench
Short
Swing
Chain
Long Swing Chain
Swing Seat
Threaded
Quick Link
102
Acro Bar
Acro Handles
Other Parts
1 x Acro Bar
2 x Acro Handle
2 x Swing Belt Seat
2 x Short Swing Chain
4 x Long Swing Chain
6 x Threaded Quick Link
Fig. 51.3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents